Caution For Ducting Work - Panasonic S-224ME2E5 Manual Del Usuario

Ocultar thumbs Ver también para S-224ME2E5:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 57

3-5. Caution for Ducting Work

• This unit has high static pressure.
In case of small pressure resistance (for instance, a short duct), install an airflow control damper (field supply) for adjusting airflow
volume as airflow volume / airflow noise increases.
• If the air conditioner is to be installed in a room such as an office or meeting room which needs a low sound level, provide a supply
and return sound absorption chamber with an acoustic liner.
• Use a flexible canvas connection or vibration isolation hanger (field supply) to break transmission of mechanical vibration of the unit.
Sound absorbing chamber
Air discharge
Sound absorbing chamber
• Use incombustible duct materials.
CAUTION
• Use thermal insulation to prevent duct condensation.
• An air filter (field supply) must be installed at the air intake side.
If not installed, the heat exchanger will get dirty and the unit will reduce the quality.
• Obtain and install an air filter (field supply) which can easily wash away the dust by lukewarm, soapy water or
suck up with a vacuum cleaner.
• Clean the air filter periodically to collect dust and other particles from the air.
• Use duct static pressure within a range of specification value.
Canvas connection
Indoor unit
Thermal
insulation
Inspection
opening
Airflow control damper
Sound absorbing chamber
Thermal
insulation
Air filter (field supply)
Ceiling panel
11
Air intake
Fig. 3-8

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

S-280me2e5

Tabla de contenido