INSTRUCTIONS FOR USE AND MAINTENANCE
2.
General safety
1. Prior to starting the testing pump, please carefully read
and follow these instructions.
2. The position and operation of the controls must be
studied prior to TP40-S pump operation
3. The TP40-S has been designed for specific applications.
We strongly recommend that it SHOULD NOT BE
MODIFIED, nor used for other purposes.
4. Using only the liquids specified for the tests is utterly
important for the integrity and durability of the liquid-
tight systems. NO acids or other corrosive liquids may
be used for the tests. Use only clean water or oil as an
alternate.
5. Check the pump for damaged or defective parts prior
to pump operation. The pump MAY NOT BE USED if
pressure hoses or any other parts are flawed or broken.
6. Only original SUPER-EGO parts may be used for
maintenance
3.
Operating instructions
1. Connect the pressure hose to the equipment to be
tested with valve V1 opened and valve V2 closed (Fig.1).
Remove the handle-locking hook.
2. Open one or several purge points in the installation
and pump liquid until all air has been purged from the
installation. Close the vent points. Fill the installation
operating the pump handle with ample movements
(Fig.2).
3. Keep on pumping until the test pressure has been
reached (Fig.3).
4. Close valve V1 (Fig.3).
5. If the test pressure is exceeded during the pumping
operation, crack open valve V2 until the required pressure
is attained. Then close all the valves.
6. If no leaks are present, no pressure drop will be detected
in gauge readings. At test completion, open both valves
V1 and V2 (Fig.4).
!
After the pressure has been reached, wait for the
pressure to stabilize as a function of the size of the
installation. If it should be required, pump again until
the pressure is reached again.
NOTE
7
4.
Maintenance
Keep the tank and pump system clean. The suction pipe
is supplied with a filter to prevent dirt entering the pump
pressure system. If the filter should clog, remove the dirt
and clean it with water.
Grease the piston periodically with water repellent grease.
Be extremely careful not to damage the piston. For the
maintenance and life extension of your TP40-S testing
pump, SUPER-EGO offers the following maintenance kit:
V13009900 – Maintenance kit
5.
Specifications
Name:
Code:
Dimensions:
Weight:
Tank volume:
Piston volume:
Outlet connection:
Testing fluid:
Maximum temperature:
Maximum pressure:
6. Pump parts
A.
Pressure hose
B.
V1: Shut-off valve
C.
V2: Purge valve
D.
Locking hook
E.
Handle
F.
Tank
B
A
Testing pump TP40-S
6.0220
570x170x260 mm
5,5 kg
6,5 l
45 ml
R 1/2"
Water, oil
50º C - 120ºF
50 bar. 725 psi. 5 Mpa
C
E
D
F