Descargar Imprimir esta página

Steelcase Customer Service Kits for Pocket Instrucciones De Montaje página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

®
HEALTH
Reach Arm Replacement
3.
Use 8 mm socket underneath top plate to
remove four (4) M5 kep nuts from corners of
bottom plate housing.
4.
Lift and remove top plate carefully. Position
top plate with arm assembly upside-down.
5.
Note alignment of reach arm to attaching
screws. Use 2.5 mm hex key to remove three
(3) M4X8 flat head screws and lock washers.
Pull straight and remove arm from top plate.
6.
Reverse steps 5 through 1 to install
replacement arm.
NOTE:
For Height Adjustable Units
If lever is accidently dislodged from top plate, reposition
in groove with short cross rod on top and foam piece on
bottom. If foam piece has been displaced from lever,
center it along bottom of lever (side opposite cross rod)
so one end is aligned with edge of cross rod nearest
short end of lever (53 mm from end of lever). Other end of
foam should be placed about 28 mm from end of lever.
M4X8 FLAT
HD. SCREW
5
3
4
TOP PLATE
BOTTOM PLATE
HOUSING
M5 KEP NUT
Page 6 of 21
939502105 Rev F

Publicidad

loading