RAVAK R-box Multi RB 071.50 Manual De Instrucciones página 47

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25
Connect the inlets of hot and
could water pipes as well
as other function water pipes
to the R-box, tighten with wrench.
Testing procedure
2
Open the water supply
valve to check whether any
leaking from any connection
parts.
3
Sealing wall
Important: make sure the protruding
portion of the R-box is directly
perpendicular to the wall surface. This
is required in order for the covering
plate to be installed correctly.
When installing the R-box into plasterboard, use a mounting frame.
Remove the cover plate from the
embedded unit and remove the
2 blanks on the water outlet in
accordance with fig.
Remove the two sealing rubber
plugs from the body. Then
re-install the sealing board with
the Allen key.
90°
Make sure no leaking after
the test mentioned above, then
seal the R-box and the water
pipe with cement.
Open the hot and cold water shut-off
valves to flush the pipes and clean
them of sand and other small-
grained dirt. Check that water flows
out of all connected outlets.
Glue the plaster guard around
the protruding R-box to protect
the wall around the R-box.

Publicidad

Tabla de contenido
loading

Tabla de contenido