Final Setup - GE DPVH891 Manual Del Propietario E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FINAL SETUP

LEVEL THE DRYER
1
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front
to rear.
Raise
Lower
ATTACH SERIAL CABLE
2
Attach the serial cable for washer and dryer
connection to the serial port on the back of
the dryer.
Attach the other end of the cable to the washer
before pushing the washer into its final position.
PLUG DRYER IN
3
Installation Instructions
Serial Port
Rear of
Dryer
Ensure proper
ground exists
before use.
GROUNDING INSTRUCTIONS
4
This appliance must be grounded. In the event
of malfunction or breakdown, grounding will
reduce the risk of electric shock by providing
a path of least resistance for electric current.
This appliance is equipped with a cord having an
equipment-grounding conductor and a grounding
plug. The plug must be plugged into an appropriate
outlet that is properly installed and grounded in
accordance with all local codes and ordinances.
DRYER STARTUP
5
Press the POWER button.
NOTE: If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
POWER. Otherwise, the display will not come on.
The dryer is now ready for use.
SERVICING
WARNING –
to disconnection when servicing controls. Wiring
errors can cause improper and dangerous
operation after servicing/installation.
For replacement parts and other information,
refer to the back cover for servicing phone
numbers.
32
Label all wires prior

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dpvh890Upvh890

Tabla de contenido