Faucet Installation - Pfister Delton 35 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Thank you for purchasing this Pfister product. All Pfister products are carefully engineered, and factory tested to provide long
trouble-free use under normal conditions. This product is easy to install using basic tools and our easy to follow illustrated
instructions. If you have any questions regarding this product, call 1-800-Pfaucet (1-800-732-8238).
1 BEFORE PROCEEDING
WARNING: Read all the instructions completely before proceeding. Pfister
recommends calling a professional if you are uncertain about installing this product!
This product should be installed in accordance with all local and state plumbing and
building codes.
2
2 SHUT OFF WATER SUPPLY
Locate water supply inlets and shut off the water supply valves. These are usually found
under the sink or near the water meter. If you are replacing an existing faucet, remove
the old faucet from the sink and clean the sink surface thoroughly.
3
3 TOOLS RECOMMENDED
• PTFE Plumber's Tape
• Plumber's putty
• Adjustable wrench
• Pliers
• Cloth
Your installation may require new supply lines and / or shut-off valves or other additional
tools.

FAUCET INSTALLATION

4
BOTTOM GROOVE
4C
4A
4D
4D
ENGLISH
• Slotted screwdriver
• Flashlight
4B
4C
2
4 FAUCET INSTALLATION
Place a bead of plumber's putty in the groove along the bottom outer edge of Bottom
Plate (4A). Place Bottom Plate (4A) under base of Faucet Body (4B). From above sink,
insert Threaded Shanks (4C) through End Holes (4D) of sink. Be sure that the "Pfister"
marking is facing forward.
5
5A
5B
5 SECURING FAUCET
Align Faucet (5A) to sink surface. From underneath sink, secure Faucet using Wing
Nuts (5B). Hand tighten.
6
6B
6A
HOT
6 WATER SUPPLY CONNECTIONS
Connect water Supply Lines (6A) to Faucet Inlets (6B). Hot water supply lines go into
left inlet. Cold water supply lines go into right inlet. (Supply lines are not included).
Please follow manufacturer's instructions when installing supply lines.
7
7 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
5B
6B
6A
COLD

Publicidad

Tabla de contenido
loading

Tabla de contenido