Window Requirements; Prepare The Air Conditioner - GE AKH18 Serie Manual Del Propietario Y Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

WINDOW REQUIREMENTS

1
• These instructions are for a standard double-
hung window. You will need to modify them
for other types of windows.
• All supporting parts must be secured
to firm wood, masonry or metal.
• The electrical outlet must be within reach of
the power cord.
• Follow the dimensions in the table and
illustration for your model.
Models
AKH18DN
AKH25DN
(With accordion panels)
STORM WINDOW REQUIREMENTS
2
A storm window frame will not allow the air
conditioner to tilt toward the outside, and will
keep it from draining properly.
To adjust for this, attach a piece of wood to
the sill.
WOOD PIECES
WIDTH: 2"
LENGTH: Long enough to fit inside the
window frame.
THICKNESS: To determine the thickness, place
a piece of wood on the sill to make it 1/2"
higher than the top of the storm window
frame or the vinyl frame.
Attach securely with nails or screws provided
by the installer.
1/2" higher
than storm
window
frame
Storm window
frame
Installation Instructions
A
B
18 3/8"
27"–42 1/2"
19 1/2"
29 3/4"–44"
A
B
1/2" higher
than vinyl frame
(on some windows)
Wood
Sill
Vinyl frame
3

PREPARE THE AIR CONDITIONER

A
Pull down the front panel and remove the
filter. Remove the front panel by lifting up
at an angle.
Remove the four front screws. Save them
B
for reinstalling the front housing.
Remove the front housing.
C
D
Remove the screw attaching the green
grounding wire to the case and save it for
reinstalling the wire.
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Akh25 serie

Tabla de contenido