The electrical connection scheme is shown in the following figure:
MONITORING
SYSTEM
The electronic board LED allows quick display of
the open (LED on) or closed (LED off) state of the
solenoid valve, if that is installed on the line.
Ensure proper connection to the positive and
negative poles of the electronic board. The power
supply unit must not exceed 30 VDC.
The monitoring system responsible for processing
the pulses generated will be connected to termi-
nals A, COM and B as follows:
• COM: connect the ground wire (GND) of the
monitoring system.
• A: connect the other wire of the management
system. The A connection Transmits pulses from
main reed sensor.
• B (opcional): the pulse generator is equipped with
two reed sensors, and if it is allowed by the monito-
ring system, connect the third wire here.
Balcrank™ Corporation · Weaverville, NC 28787 · 800-747-5300 · 800-763 0840 Fax · www.balcrank.com
Installation
SOLENOID
VALVE
A- MAIN REED
B- SECOND REED
(OPTIONAL)
GND- COMMON
WARNING!
T
o ensure proper operaTion
,
solenoid valve
moniToring sysTem and The pulse
generaTor should be less Than
recommended To use aT leasT
a
lways check The sTaTus of connecTions and polariTy
before operaTing The equipmenT
SOLENOID
SOLENOID
VALVE INLET
VALVE OUTLET
,
The cable lengTh beTween
32.8
. i
feeT
T is
awg20
secTion wire
.
R. 2/20
SB 3108
.
3