Página 2
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 2 Please pull out page 2 Please read the operating instructions carefully before assembling and using.
Página 3
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 3...
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 4 Scope of delivery package Caution BSM 710 E, The BSM 710 E is not desi- Quick-change drill chuck 2 -13 mm, gned for the operating of auxili- Additional grip with bit stop ary devices.
Página 5
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 5 tor in walls where power, water or gas lines are laid invisibly. Wear protection goggles and use a dust mask for dust-produ- cing work. Always arrange for a qualified electrician to carry out repairs Use only original replacement parts...
Página 6
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 6 On/Off switch: To switch on: Press switch A Continuous operation: Lock switch A with locking button B To switch off: Press switch A briefly The speed is varied by applying more or less pressure on switch A.
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 8 GARANTIEURKUNDE Auf das in der Anleitung bezeichnete Gerät geben wir 2 Jahre Selbstverständlich bleiben Ihnen die gesetzlichen Gewähr- Garantie, für den Fall, dass unser Produkt mangelhaft sein sollte. leistungsrechte innerhalb dieser 2 Jahre erhalten.
Página 9
Anleitung BSM 710 E SPK 7 GB 07.04.2004 12:45 Uhr Seite 9 ISC GmbH Turkestan Eschenstraße 6 Investitions- Baugesellschaft D-94405 Landau/Isar Christofor Stefanidi Tel. (0180) 5 120 509, Fax (0180) 5 835 830 Belinskij-102 KZ-4860008 st. Chimkent Hans Einhell Österreich Gesellschaft m.b.H. Tel./Fax 03252 242414 Mühlgasse 1 A-2353 Guntramsdorf...