Descargar Imprimir esta página

Installation Procedures - Thermon Terminator ECM-R-XP Guia De Inicio Rapido

Publicidad

Terminator
The following installation procedures are suggested
guidelines for the installation of the Terminator ECM-R-XP
Kit. For translations other than English and local language
translation provided here, please contact Thermon. The
English language installation procedure shall govern.
Receiving, Storing and Handling . . .
1. Inspect materials for damage incurred during shipping.
2. Report damages to the carrier for settlement.
3. Identify parts against the packing list to ensure the
proper type and quantity has been received.
4. Store in a dry location.
Kit Contents . . .
1
2
3
Item
Quantity
Expediter Assembly
Support Cap with O-Ring
1
1
Threaded Grommet Compressor
Grommet
Support Base with O-Ring
2
1
Junction Box Lid
Junction Box Base with O-Ring & M25
3
1
Dust Cap
4
1
Nut
5
1
Banding
6
1
Banding Guide
Electronic Control Module w/ Terminal Blocks
(Refer to terminal specifications for maximum allowable wire size)
ECM Type*
7
1
C - Controler
L - Limiter
CL - Controller/Limiter
* The maximum pipe exposure temperature is limited to 250°C
8
1
Junction Box Lid Cord
9
3
Blind Plug
Order Separately . . .
PETK Power and End Termination Kits (per cable)
PETK-5
for direct connection
PETK-10
for cold lead connection (TESH 2.9-15)
PETK-11
for cold lead connection (TESH 17.8-8000)
ECM-R-XP
TM
4
5
6
7
8
9
Description

INSTALLATION PROCEDURES

Dimensions . . .
Warnings . . .
• Due to the risk of electrical shock, arcing and fire
caused by product damage or improper usage,
installation or maintenance, a ground-fault protection
device is required.
• Installation must comply with Thermon requirements
(including form PN 50207U for Ex systems) and be
installed in accordance with the regulations as per the
norm EN IEC 60079-14 for hazardous areas (where
applicable), or any other applicable national and local
codes.
• Component approvals and performance ratings are
based on the use of Thermon specified parts only.
• De-energize all power sources before opening
enclosure.
• Avoid electrostatic charge. Clean only with a damp
cloth.
• Keep ends of heating cable and kit components dry
before and during installation.
• Minimum bending radius of heating cable is five (5)
times the cable outer diameter.
• Individuals installing these products are responsible
for complying with all applicable safety and health
guidelines. Proper Personal Protective Equipment
(PPE) should be utilized during installation. Contact
Thermon if you have any additional questions.
Tools Required . . .
3 mm
8 mm
2
Crimp Tool 2,5mm
Certifications/Approvals . . .
Ordinary & Hazardous Locations
II 2 (2) G Ex eb mb [ib] IIC T4, Ex tb IIIC T135°C SIRA 12ATEX5239X
II 2 (2) D Ex tb IIIC T135°C IP66 Db
International Electrotechnical Commission
IEC Certification Scheme for Explosive Atmospheres
SIR 12.0103X
2
Terminator-LN-Tool
(order separately)
28 mm

Publicidad

loading