INSTALLATION
Install the mixer on a hard and horizontal soil
in order to ensure a good stability to the
machine.
Clear the surroundings of the machine from
all thing likely to occasion a risk of accident
or to impede the operator.
Before starting your mixer
make sure that :
Electric driven mixer
• The tension of the network is 230 volts on
two wires.
• Minimum capacity of the meter should be 5
Amps.
• The motor hood set benefits from double
insulation class II protection grade IP 44.
• Foresee a two wires supply cable having a
section of 2,5 mm2 for a maximum length
of 50 m (equipment class II no need for a
ground wire). If length is more than 50 m,
foresee a cable with a bigger section.
SAFETY INSTRUCTIONS
General
Before starting your mixer, check that :
• all protection devices are in position and
good condition.
• Nobody is into contact or close to the
mixer, and no tool is leaning against it.
• Never let a cable rolled on its support,
this will cause impodant drops of tension
and lead to overheating.
• The line must be fitted with fuses or
circuit breaker to ensure the protection.
• Do not plug in and use the electric motor
without making sure that the motor hood is
closed.
GB
MAINTENANCE
• After each use, clean the inside and the outside
of your mixer. If you wash it with a high pressure
cleaner, make sure that the water projections
do not reach the motor.
• For a good and efficient leaning of the drum,
use a shovel of gravels and water.
• Do not forget from time to time to grease the
bearing of the bracket, a hole is foreseen for
this.
• The bearings of the drum and of the driving axle
are greased for life.
• The slew ring is made of synthetic material,
high resistance, unalterable, maintenance and
greasing free, which participates efficiently to
the reduction of sound nuisances.
13