NEW CONSTRUCTION, PRE-PLANNING, OR REMODELING
NOTE: For existing instruction, skip to the next section.
FOR TOP VENTING
diameter hole for the duct in the ceiling must be
centered 6-1/4" away from the finished rear wall in
the installation space.
16
Installation Preparation
left from center of the hood. Ensure enough wire length is
available to make electrical connection.
6-1/4"
FOR BACK VENTING
10-1/2"H x 13-1/4"W cut out for the duct in the wall
must be centered in the installaton space, left to
right and located 3-3/4" above intended install height
from bottom of the hood.
3-3/4"
10-1/2"H x 13-1/4"W
Bottom of Hood
49-2000706 Rev. 4