Joining station – Operating instructions
12.3 Mounting the profile plate and the control console
12.4 Cable connections
34
1
Profile plate
2
T-head nut, M6-32 (4 ea.)
3
Trolley
4
Serrated washer, J6.4 (4 ea.)
5
Washer, B-6.4 (4 ea.)
6
Socket head screw, M6x10 (4 ea.)
7
Self-tapping screw, 3.5x9 (2 ea.)
8
Control console
1
PLC board to station
When using the SysLink 19" system
plug module: connect socket A to the
SysLink socket on the C interface using
a SysLink cable, or the SysLink socket at
the station's digital I/O terminal.
PLC board to control console
2
When using the SysLink 19" system
plug module: using a SysLink cable,
connect socket B to the SysLink socket
on the control console.
PLC board to power supply
Insert the 4 mm safety plugs into the
sockets on the power supply.
PC to PLC
Connect your PC to the PLC using a
programming cable.
© Festo Didactic 8122168