Installation Procedures
(2) Location of ceiling suspension bolts
30mm
Suspension bolt pitch
INDOOR UNIT (TOP VIEW)
For half-concealed installation, the supension-bolt pitch should be as shown in the figure below
40mm
Celling opening
Celling opening
640mm
(3) Installing the Hanger Bolt :
Use an M10 hanger bolt (prepared on the site) with a 60mm hole depth, with clearance fixed according to the size
proposed in the air conditioner's external view; installation must be performed basisthe different building structure
specifications to guard against safety faults.Levelling instruments will be available to ensure accurate installation.
Dotted line suggests
position behind the unit;
please cut off before use
(4) Please use hexagon bolts during installation.
30mm
Dimensions (Space
Required for installation)
mm
10mm
155mm
300mm
Suspension bolt should extend
outword 30 to 50mm
40mm
mm
Celling panel
15mm
Celling panel
Position of Hanger Bolt
B(mm) (internal hanging)
40VC009F-7S-QEE
40VC012F-7S-QEE
40VC016F-7S-QEE
40VC018F-7S-QEE
40VC024F-7S-QEE
40VC028F-7S-QEE
40VC030F-7S-QEE
40VC038F-7S-QEE
40VC048F-7S-QEE
40VC054F-7S-QEE
Indoor Unit
10
Model
L
880
1204
1530
Suspension bolt should
extend outward 30 to 50mm.
8-13mm
Bolt