Fuse Replacement - Viqua H El Manual Del Propietario

Ocultar thumbs Ver también para H:
Tabla de contenido

Publicidad

13
13
• Reinstall the O-ring at the
bottom of the sleeve.
Note: After replacing the UV lamp or sleeve perform the disinfection procedure, refer to

4.3 Fuse Replacement

The system comes equipped with two functioning 250V 3A fuses. To access the fuses, first unplug system and disconnect
the power cord from the controller. Remove the fuse door by pushing in the tab on one side using a knife or other tool and
gently prying outwards. Repeat on the other side.
Procedure:
1
• Disconnect the controller to
the system.
4.4 Flow Meter Sensor Maintenance
Inspect Flow Meter Sensor periodically to ensure that there is no fouling and the paddle wheel spins freely with no
resistance.
If paddle wheel does not spin freely or is loose the sensor should be returned for service and calibration. It is recommended
that the Flow Meter Sensor be returned for calibration every two years to ensure accurate system operation.
14
14
1
2
3
• Connect the sleeve bolt at the
bottom.
• When service is complete,
assemble the prerequisites in
the reverse order of
disassembly.
2
• Replace the fuse.
Maintenance
Section
3.2.
14

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

KH plusK plusPro10Pro20Pro30 ... Mostrar todo

Tabla de contenido