Descargar Imprimir esta página

Barrette 34111492 Manual Del Usuario página 4

Publicidad

Idiomas disponibles

Idiomas disponibles

4
.
Through bolt application:
b
a. Install blocking at post locations determined in
Step 2b.
b. Beneath all post locations install at least two
(2) 2x8 blocks (Fig. 5) using at least three
(3) #10x3
penetrating through the joists at least 1
the blocks (Fig. 6).
c. Use the post assembly to mark the holes for
the surface mounting plate (Fig. 7). Mark and
pre-drill
d. Secure post to the deck using
bolts, washers, and nuts (Minimum 6" long)
through decking, blocking, and required
mounting sandwich plate to underside of
blocking (Fig. 8).
TIP:
Shims are included with your post kit. Use
these to plum your posts before finishing
your installation to be sure all posts are level.
5.
Measure to install posts. If not cutting down rails,
inside edge of post should measure 64" (Fig. 9).
Install posts accordingly.
NOTE:
If cutting section down, see below for
calculation for rails and infill boards lengths:
"X" = Inside Edge of Post
Rail Length = "X" + 2.75"
Infill Board Length = "X" + 2.00"
See Figure 8 for reference.
4
" deck screws (sold separately)
1
2
" holes through wood deck (Fig. 7).
3
8
" into
1
2
" galvanized
3
8
"
1
8
Post
3
3
⁄ ⁄
"-18 Thread X 7"
"-18 Thread X 7"
8 8
Corrosion-Resistant Bolt
Corrosion-Resistant Bolt
3 3
Wood
Deck
Underside Deck View
3
"-18 Corrosion-
8
Resistant Nuts
Plate
64"
Inside Edge
of Post
"X"
Fig. 5
Fig. 6
Fig. 7
⁄ ⁄
" Washer
" Washer
8 8
3 3
⁄ ⁄
" " Through
Through
8 8
Hole
Hole
Fig. 8
Post
Fig. 9

Publicidad

loading