Angelcare® Monitor Installation - Angelcare AC1100 Manual Del Propietário

Ocultar thumbs Ver también para AC1100:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ANGELCARE
MONITOR INSTALLATION
®
A. INSTALL THE PARENT UNIT
POWER
On/Off
B. INSTALL SENSOR PAD UNDER THE MATTRESS
Sensor Pad
I sensor pad
Crib center
All manuals and user guides at all-guides.com
A
B
Mattress
Hard board
(not included)
Crib Base
(Available in certain countries only)
Please refer to SETTING pages for further details
C
2 sensor pads
Crib center
9
1. Remove the belt clip, unscrew the
back panel and insert the 3 AAA
NIMH rechargeable batteries included
into Parent Unit .
2. Connect the AC adapter to the
Parent Unit charger and plug
adapter into the electrical outlet.
Charge for a minimum of 10
continuous hours before using the
monitor for the first time.
3. Turn the Parent Unit ON by pushing
and holding the POWER button for 2
seconds.
4. Screen A will appear and then turn to
the video caption B. When the
Nursery Unit is OFF, screen C will
appear and the Parent Unit will
automatically shut off after 1 minute.
In this case, turn ON the Nursery Unit
and then turn ON the Parent Unit
again.
1. Remove mattress from the crib. Place
a hard board in the center base of the
crib, right under the Sensor Pad(s).
2. Position the Sensor Pad (as shown),
in the center of the crib. Make sure
the printed side faces up. Do not
place any bedding between the
mattress and the Sensor Pad.
E
N

Publicidad

Tabla de contenido
loading

Tabla de contenido