Descargar Imprimir esta página

Rev-A-Shelf 5149 Serie Guia De Inicio Rapido

Plantilla para la instalación de contenedores de basura

Publicidad

Enlaces rápidos

TOOLS reQUIreD:
3/32"
Rotate metal retainer clip and slide clip out to pop
spring off of ball-stud.
Fig 1
Front edge of paper
to back of door.
Many of our products feature installation videos. Visit Rev-A-Shelf.com for more details.
5149 Series Shallow Depth Waste Container
Installation Template
eSTImATeD ASSembLy
TIme:
20 mIn
Fig 2
Press release lever behind side skirt on each side by
sliding up or down depending on which side. Unit
will seperate with both levers disengaged.
For horizontal adjustment loosen
4 3/8" nuts and move to desired
position
Fig 4
1)
Pre-drill mounting holes in the locations marked on this Template using a 3/32" drill bit. Be sure the template is centered left to right.
The front edge of the template should be aligned with the back of the door.
2)
Use the #8 x ¾" Phillips head screws provided to secure the unit to the floor. The slide system can be separated if necessary to aid in
installation, but removal is not required. (See FIG 1 and FIG 2)
3)
Ensure that the door mounting brackets allow the mounting screws to engage a part of the door that is at least 3/4" thick. (On a
5-panel door, this would be the outer side pieces, or styles) Inset doors would move the
brackets toward the center of the unit while full overlay doors would require the brackets to move outward. (See FIG 3) Use the
double sided tape provided to temporarily attach the door to the mounting brackets.
4)
Carefully open the unit, being sure not to disengage the double sided tape. Once the unit is open, use the #6 x ½" flat head screws to
permanently attach the door to the unit.
Door Adjustment
Vertical mounting slots have been used in the bracket that attaches directly to the door. Use these slots for vertical adjustment. (See FIG 4)
Horizontal adjustment is achieved by loosening all 4 of the 3/8" nuts that connect the two brackets and moving the door left to right as needed.
(See FIG 4)
For door tilt adjustment, loosen the 4 #3 phillips head screws below the skirt and adjust. The rear screws are slotted to allow the door to pivot at
the front of the bracket. (See FIG 5)
Keeping the front screws "snug" will aid in adjustment.
CAre AnD mAInTenAnCe:
CLeAn WITh A DAmP CLOTh
AnD WIPe PArTS Dry
Door thickness must be at least 3/4" where
screws attach
Mounting screws much engage 3/4" thick
material minimum.
Adjust bracket left to right before
attaching door with double-sided tape.
Use vertical slots for
vertical door adjustment
Front of Unit
Door tilt adjustment screws
Center of Cabinet
PArTS LIST:
PULLOUT ChASSIS
WASTe COnTAIner ChASSIS
WASTe COnTAIner(S)
(8) #6 x 1/2" FLAT heAD SCreWS
(5) #8 x 3/4" PAn heAD SCreW
DOUbLe SIDeD TAPe
Recommended Screw and Pilot
Hole Location (5) Places
Fig 3
Fig 5
T-5149V-0613-TRI

Publicidad

loading

Resumen de contenidos para Rev-A-Shelf 5149 Serie

  • Página 1 (See FIG 5) Keeping the front screws “snug” will aid in adjustment. Center of Cabinet Front edge of paper to back of door. T-5149V-0613-TRI Many of our products feature installation videos. Visit Rev-A-Shelf.com for more details.
  • Página 2 Du bord avant du papier à l’arrière de la porte. T-5149V-0613-TRI Muchos de nuestros productos tienen videos de instalación. Para más detalles, visite la página de internet Rev-A-Shelf.com Beaucoup de nos produits disposent de vidéos d’installation. Visitez Rev-A-Shelf.com pour plus de détails.