Descargar Imprimir esta página

WMB TE-074PS Manual De Instrucciones página 14

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating instructions
4. Operation.
4.1 - When placing the lift in its working
position, ensure that the wheels (T) are on a
solid, level surface.
4.2 - Remove the legs from their supports (S)
and insert them into the holes (V) checking
that they are tightly fastened with the safety
catches (R).
4.3 - Adjust the vertical position of the lift (Q)
by rotating the hand crank (H) in the correct
direction to keep the bubble in the center of the
spirit level (F).
4.4 - Place the load on top of the lift using a
suitable support, lifting only in a vertical
direction. The minimum load must be 55 lbs
/ 25 Kg.
4.5 - Lifting:
Elevate the tower rotating the hand crank
of the winch (W) clockwise (N
up to desired height.
Depósito legal y Copyright 2006. Todos los derechos reservados.
All manuals and user guides at all-guides.com
), lifting the load
1
ENGLISH
4.6 - Lowering:
The manoeuvre of lowering is obtained
by the opposite way. Lift the blockade on the
safety catch (M3) and rotate the hand crank of
the winch in a counterclockwise (N
the load until that the third profile would be
completely folded.
Lift the blockade on the safety catch
(M2) and continue lowering the tower until that
this second profile would be completely folded.
Lift the blockade on the safety catch
(M1) and continue lowering the load until that
the tower would be completely folded down to
its minimum height.
The tower can be left in any intermediate
position wich would be necessary, the same
as lifting the load.
4.7 - For the transport of the tower is necessary
to fold the tower lowering completely all the
profiles, blockading them with the safety
catches (BT). Get out the legs lifting the
blockade on the catches and put them in their
transport lodging (S).
) lowering
2

Publicidad

loading

Este manual también es adecuado para:

Te-074pb