Hand Spindle Pump
CPP1000-M/-L
3. Commissioning and operation
3.1 Preparation
3.1.1 Setting up the device
Set up the hand spindle pump on a solid surface.
■
Avoid unsafe mounting conditions. If necessary, it can be secured by mounting on
a baseplate or workbench using appropriate screws. Two drillings (Ø 6.4 mm) are
available on the front flange for this purpose.
Place the star handle with knobs onto the spindle pump.
■
Ensure that the spring-loaded thrust pad engages into the star handle bushing.
3.1.2 Filling in of operating liquid (first commissioning)
As an operating liquid only the following are suitable for the
CPP1000-M/-L:
■
■
Distilled water and water-based hydraulic fluids are not
suitable!
Other pressure transmitting media are available on request.
Fill the hand spindle pump with a suitable operating liquid as follows:
Turn the spindle completely clockwise.
■
Open the shut-off valve and unscrew it completely, then remove the top cover of the
■
reservoir.
Pour the operating liquid carefully and slowly, alternating between both pressure
■
connections. You can monitor how the operating liquid settles into the reservoir.
Pour the liquid into the pressure connections until the reservoir is ½ to ¾ full.
Place the top cover of the reservoir back on and reattach the shut-off valve.
■
WIKA Operating Instructions Hand Spindle Pump
Mineral oil based hydraulic fluid
Clean water, free of calcium-carbonate / scale
GB
7