All manuals and user guides at all-guides.com
Prepare the Site - Freestanding Installation (cont.)
Solder 1/2" male copper connections to the water supply lines.
The measurement to the top of these connections should be
approximately 21-1/4" (54 cm) from the surface of the finished
floor.
Apply thread sealant to the male copper connections on each
water supply tube.
1054455-2-B
8
Kohler Co.