Installation Preparation; Tools Needed For Installation; General Preparation - Haier HHX1030 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

English
All manuals and user guides at all-guides.com

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.

Tools Needed for Installation

• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, rule and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Duct tape
• Electrical tape
• Connector Clamp

General Preparation

Caution! Please be sure to turn the electrical power switch OFF before beginning
the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or
paper to prevent scratching the hood or table.
3. Unscrew the lamp cover with a Phillips head screwdriver.
4. Remove the lamp cover.
5. Install one 40 Watt light bulb.
6. Replace the lamp cover and the screws.
4

Publicidad

Tabla de contenido
loading

Tabla de contenido