Commissioning; Technical Data - Festo EduTrainer Universal Manual Del Usuario

Ocultar thumbs Ver también para EduTrainer Universal:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3 Holder system with power supply

3.2 Commissioning

When the mains cable is plugged in, voltage is present at the mains switch as far as the power supply
unit (110/230 V AC).
Assembly work must only be carried out when the power supply plug is unplugged.
1. Assemble the required simulation plates and 4 mm connection plates if applicable.
2. Connect the EduTrainer
3. Switch on the mains switch.

3.3 Technical data

Operating voltage
Output voltage
Fuse
Output current
Connection
Front-plate width, power supply
Size 1
Size 2
Electromagnetic compatibility
Interference emission
Interference immunity
Subject to change
50
All manuals and user guides at all-guides.com
®
PLC to the laboratory power supply.
110 V ... 230 V AC
24 V DC
3.15 A slow-blowing
Max. 4.5 A
4 mm safety sockets/3-pin plug for internal supply to modules
6 modules
297 mm x 305 mm x 120 mm (60 modules)
297 mm x 458 mm x 120 mm (90 modules)
Tested to EN 61000-6-3
Tested to EN 61000-6-1
© Festo Didactic GmbH & Co. KG 739319

Publicidad

Tabla de contenido
loading

Tabla de contenido