Installation and start-up
a
b
c
1
d
j
e
f
g
h
i
5 x M10 x 20
2
2.2
f o r -
w a r
d
2.3
3
≥ 180°
ca. 140°
ca. 140°
≥ 180°
depending on the
rotation area
Unpacking the swivel adapter
Supplied with (partly pre-assembled):
a) 6 countersunk head screws M8 x 30
b) 5 countersunk head screws M10 x 20
c) 1 Cylinder head screw M6 x 6 for the end stop
d) Swivel unit
e) Spacer
f) Base plate
g) Baffle short
h) Baffle long
i) Locking mechanism
j) 5 ml Loctite 243
!
Dispose of packaging material properly
and keep away from children.Do not
use defective material.
Mounting the base plate
1. Place the base plate with the
notch facing the umbrella onto the
in-ground stand. When using a
base, the base must be rotated as
needed.
2. Screw on the base plate tightly.
3. Place the spacer on top.
!
The notch must be positioned facing
the umbrella.
Inserting the stop screw
For the first production series (only 1 large
borehole in the rotary unit), only the right
hand side position is possible, as otherwise
not all the M8 screws (as per 4.2) can be
fitted.
1. Determine the correct position for the
stop screw.
2. Screw in the stop screw very tightly.
If no power supply is used, the stop screw
can be omitted, allowing a 360° rotation.
!
On electric umbrellas, the stop screw
MUST be inserted!
26
27
large
boreholes
4.1
4.2
6 x
5.1
f o r w
6.2
small
4
borehole
Mounting the swivel unit
1. Position rotary unit on the intermedi-
f o r w
ate ring with the flat side on top. One
a r d
of the two large boreholes must be
aligned to the base plate, with one
borehole in the intermediate ring.
2. Pre-assemble M8 x 30 countersunk
head screws.
3. Check the rotation area on both sides.
4. Reattach stop screw if necessary.
5. Tighten countersunk head screws
firmly.
The smaller drill hole must face for-
!
ward (towards the umbrella roof).
5
Premounting the upright pole
5.3
5.4
1. Place the upright pole on the swivel
unit. The side with the two tapped
holes must face forward (towards
the umbrella roof).
2. Align hole pattern / position.
a r d
5x
3. 5 Place washers on top.
4. Partially screw on the upright pole
using 5 hexagonal screws.
!
The side with the two tapped holes
must face forward (towards the
umbrella roof).
6
Premounting the locking mechanism
1. Push the locking mechanism in fully.
2. Lightly fix locking unit in place (on
lever at the top) by means of the two
M6 x 12 stud bolts.
2x
3. Push the upright pole cover
onto the mast. (included in the delivery
of the upright pole)
!
The umbrella is very heavy. Work as a
trio and hold the umbrella securely.