Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

To lower the base to the flat position during an electrical power outage, complete the following procedure:
steP 1
Verify power is unplugged from electrical power source.
steP 2
Locate (1) power brick (FIGURE 7) and (2) 9 volt batteries (not
included).
FIGURE 7
steP 3
Install (2) 9 volt batteries in power brick (FIGURE 8).
FIGURE 8
UNDERSIDE OF
POWER BRICk
12
500 Adjustable Base Owners Manual 99301625-d
All manuals and user guides at all-guides.com

Power down oPeration

POWER
BRICk
INSTALL (2) 9 vOLT BATTERIES
*BATTERIES NOT INCLUDED
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido