2. Installation procedure
Draw the slot as the dimension indicated in the figure, within the dot line frame (only A525165303) required to be added
with power cord slot drawing.
Water inlet
≧75
≧75
≧90
≧90
3. Connect water supply pipe and outlet pipe connector
1. Leave cable hole on the valve box beforehand for using it as an insertion hole for cable to be installed.
(only A525165303)
2. Connect water supply pipe and outlet pipe connector which aligned with the central of urinal.
3. Put valve box into the slot and use block to fix the required position of valve box.
4. Connect water supply pipe and valve connector, tie it firmly.
1
Attention
In case that the installation of valve box is leaning or improperly fixed, those will affect the finished good appearance or
product life.The direction of water inlet and outlet should not be wrongly connected during installation; otherwise, the
product cannot be operated.
Before filling with the cement, please confirm if there is any leakage at connecting part by conducting water test.
4. Close water
Close the shut off valve included on the product.
≧75
AC110-240V~(A525165303)
≧90
≧90
(mm)
3
>100mm
AC100-240V
50/60Hz
2
2
>100
4
Central line of urinal
Power cord
extensibility
>100mm
Block