Initial Start-Up; Setting Up And Switching On - Waeco AirCon Service Center ASC5100G Instrucciones De Uso

Estacion de mantenimiento de aire acondicionado
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ASC5100G
7

Initial start-up

7.1

Setting up and switching on

1. Drive the AirConServiceCenter to the workplace.
2. Lock the front wheels (6).
I
NOTE
During operation, the unit must be on a level, flat surface so that
measurements can be made correctly.
3. Connect the AirConServiceCenter to the mains.
4. To switch it on, set the main switch (12) to I.
The switch-on delay runs for 35 seconds and the housing is venti-
lated. The software version number then appears in the display (1)
for several seconds:
"SW": Software status
"DB": Database
"SN": Serial number
"LF": Language file
✓ When the start-up procedure is complete, the AirConServiceCenter
displays the following:
I
NOTE
Ignore any error codes which occur during commissioning (see
page 105) and skip by pressing ENTER.
EN
All manuals and user guides at all-guides.com
WAECO INTERNATIONAL
ASC5100G
SW
DB
SNxxxxxx
LF
Refrigerant
11:56:35
5ELU0076
ldyf1701
12340061
g.
XXXX
10/03/17
Initial start-up
67

Publicidad

Tabla de contenido
loading

Tabla de contenido