OPERATION
1. Place work piece on bed frame.
2. Locate and close release valve.
3. Pump handle until the ram nears work piece.
4. Apply load to work piece by pumping handle. Do not overload work piece.
5. Remove load from work piece by turning release valve. Stabilize work piece so it does not fall
while pressure is released.
6. Remove work piece after ram is fully retracted.
MAINTENANCE
•
Periodically, lightly oil all moving parts including the pump piston and hydraulic ram.
•
Check hydraulic connections and hoses before each use.
•
Do not use if cut, damaged, leaking or otherwise damaged connections and/or hoses are noted
DISASSEMBLE DRAWING
No.
Description
1
Pressure gauge
2
Damping nut M16
3
Washer M16
4
Jack
5
Pole
6
Bolt M10×15
7
Washer M10
8
Pin
9
Tighter the scres
10
Damping nut M10
11
Connect board
12
Bolt M10×25
13
Leg
14
Handle
15
Pump
16
Adjust beam
17
Arbor plate
18
Limit circle
19
Limit ring
20
Cross beam
21
Bolt M16×40
BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Qty.
1
8
16
1
2
4
28
2
4
12
1
12
2
1
1
1
2
1
1
1
8
Tel.: 02196 720480
Fax.: 02196 7204820
mail@bgs-technic.de
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed