Carrier XCT 7 40VC009F-7G-QEE Manual De Funcionamiento Manual De Instalación página 20

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 128
Installation Procedures
m Air Conditioner Installation Diagram
Hanger Bolt
Bolt Sleeve
Flat Spacer
Double Nut
Hanger bolt is 40mm below ceiling.
Ceiling
Leveling is forbidden after air conditioner
is installed; please make adjustment
according to the diagram indication
n Installing Deco Plate and Inlet Grille (after pipeline laying and electric wiring are done).
Ceiling
Mounting Rac k
Hexagon Bolt
(Wall)
Insert hexagon bolt into slot
Screw tight hexagon bolt to fix air
conditioner
CAUTION: Drain pipe should be positioned
on the high inside and low outside.
As per the requirement on the site, drain pipes
should be prepared by users from their own
resources. Make sure that these are connected
to drain pipes previously available with the unit
(make sure that measures are taken to guard
against water leakage in junction areas). Heat
preservation will be available with certain
indoor drain pipes by using heat insulant to
prevent condensation.
13
Mounting Rack
Bolt

Publicidad

Tabla de contenido
loading

Tabla de contenido