Misuse; Foreseeable Misuse; Residual Risk; Limitations Of Liability - Kerbl C10 Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 75

4. Misuse

4.1 Foreseeable misuse

Caution!
The circulation pump must not be operated above the voltage, speed, pressure and temperature limits specified on the individual
type plates. The prescribed electrical connection values, installation and maintenance instructions must be observed.

4.2 Residual risk

This unit complies with the recognised rules of technology and relevant safety regulations. However the following can still occur when the unit is
being used:
• Danger to life and limb of the operator or other persons.
• Defects developing on the unit itself.
• Defects developing on other equipment.
Under the following circumstances, the safety of persons and material objects can be endangered:
• If any damage to the electronic control unit is not repaired immediately.
• Carrying out troubleshooting, adjustment, cleaning, repair and maintenance work
• contrary to the information in the operating instructions.
• If untrained personnel are working on electronic parts.
• Failure to observe safety instructions and warning labels on the product and the safety instructions in the operating instructions.
• Unauthorised modifications to the unit.
• Use of non-original manufacturer spare parts.

5. Limitations of liability

We expressly point out that, according to the product liability law, we are not liable for damages caused by our unit if they are caused by non-
observance of the operating instructions, improper use, improper repair or if original parts are not used when replacing parts and the repair was
not carried out by customer service or an authorised specialist. This also applies to accessory components.

6. Assembly and initial commissioning

6.1 Delivery condition

Before commissioning, the C10 circulation pump must always be checked for completeness, visible defects transport damage.
• Check the unit for loose or hanging parts or damage sustained during transport.
• Check the cable insulation.
• Completeness

6.2 Space requirements

The dimensions and weight of the unit can be
found in the technical data. For maintenance
work, a free space of at least 50 cm must be
planned to the right of the screw-in heating
element.

6.3 Installation location

Caution!
• The C10 circulation pump must be installed
in a dry room protected from frost and
draughts.
• The automatic air vent valve must also be
installed in a frost-free area at the highest
point in the ring pipe.
• If the highest point is not in a frost-free
room, the frost resistance of the valve must
be ensured by insulation and trace heating.
• The C10 circulation pump must be mounted
horizontally on a fireproof base.
500
36

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

223130

Tabla de contenido