Nemox i-Green Gelato NXT1 Instrucciones De Uso página 5

Ocultar thumbs Ver también para i-Green Gelato NXT1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 44
Preparation times and storage phases are set automatically by the machine software, according to the constant
reading (detection) of the room temperature and density of the mixture.
How to proceed: Ensure that the voltage indicated on the data plate matches the mains voltage. Plug the power plug into the
wall socket. The electronic board will perform an initialization check, lighting all LEDs on the control panel, after which only
the faint lighting of the start key (L.1) will remain. The machine is ready for use.
Pour the mixture.
Ÿ
Position the transparent cover (D).
Ÿ
Press and hold the start key (L.1) on the control panel (L) for two seconds.
Ÿ
The machine starts an automatic ice cream
Ÿ
production.
The progress of the preparation is indicated by
Ÿ
the gradual lighting of the LED on the TIME
LINE bar (L.2).
At the end of the cycle, or when the ice cream
Ÿ
has reached the consistency established by
the software, the machine changes to the
storage phase.
The storage phase is indicated by the lighting;
Ÿ
all LEDs of the TIME LINE bar, storage key
(L.3), central LED of the DENSITY CONTROL
bar (L.4).
The machine automatically manages the
Ÿ
freezing and cooling equipment and, operating
as needed, the blade and the cold supply.
The ice cream can be stored for a maximum
Ÿ
period of 8 hours, after which the machine
switches off automatically.
ENGLISH
MAKING ICE CREAM WITH the NXT1 L 'AUTOMATICA
PAG. 05

Publicidad

Tabla de contenido
loading

Tabla de contenido