Installation; Installation Data; Rack-Mount Installation - Tripp-Lite SmartOnline SU1500LCD1U Manual Del Propietário

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

3 Installation

Notes:
1. Before installation, read section 1 Important Safety Instructions thoroughly.
2. Each model has internal batteries.
3. Only qualified personnel can perform installation.

3.1 Installation Data

Item
Installation Environment
UPS Dimensions (H x W x D)
Operating temperature
Relative Humidity (non-condensing)
Maximum altitude (without de-rating) 3,280 ft. (1,000 m) above sea level
Input power connection
Output power connection
Air inlet
Air outlet

3.2 Rack-Mount Installation

You can rack-mount the UPS in a 4-post frame or rack enclosure.
Notes:
• The UPS draws cooling air at the front. If the rack has a door on the front, ensure there is sufficient clearance between the UPS vents and
the rack door.
• It is strongly recommended at least two people lift the unit when rack-mounting. If only one person is available, the UPS system's internal
batteries should be taken out to reduce weight before rack-mounting. After mounting the UPS, reinstall the internal batteries.
• Use only the provided bracket ears and rail kits for rack-mount installation. Never depend on lower devices to support the UPS.
1
Attach the included bracket ears to the lateral
mounting holes of the UPS.
2
Connect the two segments of each shelf
included screws and nuts
loose so that the shelves can be adjusted in the next
step.
Specification
Indoor only
1.7 X 17.3 X 28 in. (44 x 440 x 710 mm)
32°F to 104°F (0°C to 40°C)
0% to 95%
Rear
Rear
Front
Rear
using the
A
B
. Leave the screws slightly
1
B
A
2
17

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Smartonline su2000lcd1u

Tabla de contenido