Installation Instructions
1b
1
X4
2
X4
3
Concrete Installation
1.
Determine mounting location.
WARNING:
RESULT IN SERIOUS PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! Structural members
MUST be capable of supporting five times the
combined weight of all equipment being mounted.
2.
Using the RPM as a guide, mark four mounting hole
locations with a pencil or similar tool.
3.
Drill four 1/4" (6mm) dia. pilot holes to a depth of
1 1/4"" (32mm) deep.
4.
Align four mounting holes in RPM with four pilot
holes.
IMPORTANT ! : Make sure mount is properly
oriented towards target before securing to
structure.
5.
Install four concrete anchors (Toggler AF6 Alligator)
by inserting into pilot holes and pounding in until
flush with mounting surface.
X (4)
6.
Secure RPM to structure using four 1/4" flat
washers and four 1/4" x 2 1/2" lag bolts.
5
(A)
X4
6
RPA Elite Series Projector Mount
IMPROPER INSTALLATION CAN
9