Robern CRAFT Serie Instrucciones Importantes De Seguridad página 9

Ocultar thumbs Ver también para CRAFT Serie:
Tabla de contenido

Publicidad

MOUNT WALL CLEAT AND STEEL BRACKETS
1. Locate and drill pilot holes into the finished wall and blocking using the wall cleat as a guide. Be sure to hold the wall cleat level and
at the correct height.
2. Secure the wall cleat to the wall using the #8 x 1-1/2" steel screws.
3. Hold each of the steel brackets to the wall and secure to the wall and blocking using the 1/4" x 1-9/16" stainless steel screws. The
top of the steel bracket should be lined up with the top of the wall cleat.
NOTE: The topmost screw for each steel bracket should also go into the blocking. Use appropriate wall anchors for the remaining
screws depending on your wall type (drywall, masonry, etc.).
© 2021 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
Part no. 209-1416 07/21/2021
9
800.877.2376
www.robern.com
Craft Series & Curated Bath Vanity

Publicidad

Tabla de contenido
loading

Tabla de contenido