Water Connection - Project MDI80 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 84
GB
E
V
Specification
Hardness
French degrees
German degrees
English degrees
Parts per million
Residual Minerals
All manuals and user guides at all-guides.com
If the power supply cable (provided with the equipment) needs to
be replaced use another H07RN-F type with the same
dimensions.
For additional information see the wiring drawing.
Set-up the site according the attached plumbing drawing.
Before connecting the equipment make sure that a gate valve has
been placed between the water supply and the equipment so that the
water can be turned off if required or for repair work.
Use a hose to connect the solenoid valve (E) to the gate valve (V) and
make sure that the delivery is not less than 20l/min.
Check that the temperature and water pressure correspond to
what is shown on the technical specifications plate.
If the water is harder than what is listed in the chart, it is advisable to
install a decalcifier upline from the solenoid valve.
If there are high concentrations of very conductive minerals in the
water, it is advisable to install a demineralization system calibrated to
the hardness shown in the following chart.
Maximum
2.4
Da
f
5
°dH
4
°e
5
ppm
70
mg/l
Page. 7

WATER CONNECTION

A
10
7,5
9,5
140
300/400

Publicidad

Tabla de contenido
loading

Tabla de contenido