Descargar Imprimir esta página

Kohler robern UPLIFT UC30276FPNE0N Instrucciones De Seguridad Importantes página 5

Tech gabinete

Publicidad

Idiomas disponibles

Idiomas disponibles

STEP 1A - RECESS MOUNTING
3. Remove the four screws to lower the right hand top ceiling panel inside the cabinet.
3a. This will give access to the electrical connection box.
4. Continue to page 10 for Electrical Connections.
3
5. Place cabinet in rough-in and make sure cabinet is plumb and level. If cabinet is not plumb, use supplied shims.
6. Install four screws (SS674) followed by the screw caps (SS672) as shown. Insert the hole plugs (SS134) into the remaining four
holes.
7. Go to page 12 for final assembly.
5
© 2019 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
Installation instructions
3a
CB-216-1188 HARDWARE BAG
6
CB-211-1305
QTY: 6
CB-216-1188 HARDWARE BAG
[SS674]
CB-203-1349
QTY: 12
CB-211-1305
CB-SS672
QTY: 6
CB-211-1305
QTY: 6
CB-203-1349
QTY: 12
CB-203-1349
QTY: 12
CB-SS672
CB-SS134
QTY: 6
QTY: 6
CB-216-1188 HARDWARE BAG
CB-SS674
CB-SS712
QTY: 12
QTY: 8
[SS672]
CB-SS672
QTY: 6
[SS134]
CB-SS134
QTY: 6
QTY: 6
5
CB-SS674
QTY: 12
CB-SS674
CB-SS136
QTY: 2
CB-203-1126
QTY: 6
CB-SS134
QTY: 6
CB-SS136
QTY: 2
CB-SS136
QTY: 2
Part no. 209-1311-rA rev. 06/13/19
CB-203-1126
QTY: 6
CB-SS712
QTY: 8
CB-203-1126
QTY: 6
Uplift Tech Cabinet

Publicidad

loading