Westinghouse LBA40120 Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CHARGER OPERATION
ONLY CHARGE WITH WESTINGHOUSE 40V 2A RAPID CHARGER (CGA402).
CHARGING A HOT BATTERY PACK
When using a tool continuously, the battery pack may become hot. A hot battery pack should not be
placed directly onto the charger port until the temperature cools to within acceptable temperature
range. When a hot battery pack is placed on the charger, the red LED will turn on and the green LED
will be off. Remove the battery for 30 minutes and allow to cool then place back on charger.
CHARGING A COLD BATTERY PACK
A cold battery pack may be placed directly onto the charger port but charging will not begin until
the battery temperature warms to within acceptable temperature range. When a cold battery pack is
placed on the charger, the red LED will turn on and the green LED will be off. When the battery pack
warms the charger will automatically begin charging.
LED FUNCTIONS
BATTERY PACK
RED
LIGHT
With battery pack
RED
LIGHT
With battery pack
RED
LIGHT
With battery pack
RED
LIGHT
With battery pack
RED LED
GREEN LED
GREEN
LIGHT
OFF
ON -
FLASHING
GREEN
LIGHT
OFF
ON - SOLID
GREEN
LIGHT
ON - SOLID OFF
GREEN
LIGHT
ON -
ON -
FLASHING
FLASHING
ACTION
Battery is charging.
Battery is done charging, remove battery.
Battery is too warm/cold. Remove for
approximately 30 minutes for temperature to
fall within acceptable temperature.
Battery is defective, remove battery
immediately and contact support.
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Lba40125Lba40240Cga402

Tabla de contenido