Performance Checklist - AGA marvel Professional MP36BF2 Instrucciones De Instalación

Ocultar thumbs Ver también para Professional MP36BF2:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Performance Checklist

—Verify cabinet size.
— Verify electrical supply and water
supply (if applicable).
— Install anti-tip device(s) and verify unit
is secure.
— Position unit in cutout, level at desired
height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
• Verify icemaker fi ll tube is properly
inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation
(if applicable).
—Align/square door(s).
— Verify drain pan is properly installed
and there are no leaks on water
connection.
—Install kickplate.
— Remove internal packaging and labels
and wipe unit down.
Installer's information:
Installer's name:__________________________
Installer's company:_______________________
Date: ___________________________________
24

Publicidad

Tabla de contenido
loading

Tabla de contenido