Descargar Imprimir esta página

DURAVIT BlueBox GK0900 0000 00 Instrucciones De Montaje página 5

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 8
These instructions are part of the Duravit
product and must be read carefully and kept
available at all times.
Target readership and qualifications
The product may only be installed by a
qualified plumber.
Explanation of the key words and symbols
Link to the mounting instructions
in this section
Prompt for inspection
(e.g. for scratches)
Prompt to inspect
for leaks and leak-tightness
Prompt to wear
gloves
Technical data
Operating pressure
Recommended
Test pressure
1 MPa = 10 bar = 145 PSI
Hot water temperature
MAL_57112/17.10.2
max. 0.5 MPa
0.3 MPa
0.5 MPa
max 60°C
Safety instructions
Cut and crushing injuries
> Wear gloves when installing the product.
Product and/or property damage
> Observe the local installation regulations
and any country-specific standards at all
times.
> Equalise pressure differences between cold
and hot water connections.
> Observe the manufacturer's instructions for
installation with continuous flow heaters.
Mounting instructions
3
Connecting the outlets (diagram 03)
1 outlet:
> connect either the upper or lower outgoing
line.
> Seal the unused outgoing line with a plug.
2 outlets:
the lower outgoing line (1) takes priority
> Connect the priority outlet to the lower
outgoing line (1).
> Connect the other outlet to the upper
outgoing line (2).
5
Flushing the pipes (diagram 05)
Tap unit malfunction due to dirty pipes
> Flush the pipes according to the applicable
standards before mounting the tap unit.
5

Publicidad

loading

Este manual también es adecuado para:

Bluebox gk0900 0010 00