B.
Remove bonnet (1) and test
B.
cap (2) before soldering.
Leave screen (3) installed.
Warning: Avoid soldering at
high temperature. Exposure
to high temperatures may
damage screen.
3
Connect top outlet (1) to shower pipe with
proper fittings. Connect bottom outlet (2) to
tub spout pipe with proper fittings. Pipe (3)
between valve body and tub spout must be
a minimum of 1/2" (13 mm) copper pipe or
1/2" (13 mm) iron pipe in a straight drop
no less than 8" (203 mm) but no more than
18" (457 mm) long with only one iron pipe
or copper 90 degree elbow to the tub spout
nipple. Do not use PEX tubing for tub
spout drop.
3
4
5
1
1
PRESSURE TESTING & FLUSHING
THE INSTALLATION
Prior to testing, remove cover (1), bonnet (2)
and cap (3). Ensure O-ring (4) and filter screen
(5) are properly installed. Reinstall cap and
bonnet and tighten securely. Plug both outlets
with proper fittings. Check for leaks. After
testing remove shower and/or tub spout plug
and flush system. After flushing remove filter
screen (5) and reinstall cap, bonnet and cover.
4
3
2
44551
Rev. B