Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ATTIRE:
1. Proper attire is essential to your safety. It is advised to utilize whatever means necessary to protect eyes, ears, and
skin.

INSTALLATION:

1. A Collection Pit System must already be an established structure before installing the Biological Recycling System.
A well designed pit system is critical for the proper operation of the recycle system. Consult your Mi-T-M dealer for
installation requirements.
2. Place the Biological Recycling System platform on a hard, level surface in an area free of flammable vapors,
combustible dust, gases or other combustible materials.
3. Set the unit so you have access to the Control Panel and Drain Ports.
4. Do not place unit in an area:
a. with insufficient ventilation.
b. where environmental hazards (i.e. rain and snow) can come in contact with the Biological Recycling System.
c. that can lead to a freezing environment.
5. Check all union connections for tightness.
6. Install schedule 80 PVC connections to the water inlet of the Biological Recycling System.
7. Install the Sump Pump in the Sump Pit as shown below.
8. Install plumbing from the Sump Pump using 1 1/2" minimum connection sizes.
9. Install the low level float as indicated in the drawing below.
10. A qualified electrician must hook up the electrical system.
a. Verify the electrical supply at the power source is off.
b. Be certain all switches on the Control Panel are in the "OFF" position.
c. Run water tight conduit
1. From the Sump Pump and Float to the Control Panel.
2. From the local disconnect to the Control Panel. The electrician will need to drill holes in the Control Panel
for the conduit.
d. Make connections to the terminal strips as shown in the wiring diagram below.
12
INSTALLATION
Operator's Manual

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Bio-20r-1m11Bio-20r-0m31Bio-20r-1m31Wx-0088

Tabla de contenido