STEP 5- LIFT AND HANG THE MONITOR PLATE AT THE PIPE ASSEMBLY.
Secure vertical rails to horizontal
chrome rod on Monitor Plate with
pre-installed screws.
Rotate ratchet handle lever clock
wise for tensioning tilt mecha-
nism. For additional tension pull
lever laterally, rotate counter
clock wise and repeat until
desired tension.
X2
A1
A2
and
Secure Nylon Nut
and Washer on
Monitor Plate to Pipe
Assembly (snug
tension only)
A1
Allen Wrench
A2
M6 Nut
A3
Washer
A3
P6