Disconnect the infl ation hose (7) from the air valve and the infl ation pump, and attach the pressure
7.
gauge (5) to the air valve. The pressure gauge indicator should be in the green area for a properly
infl ated spa tub (see drawing 6). Repeat previous steps to add more air if necessary.
Replace the air valve cap back.
8.
NOTE: The cap is designed to be screwed on and off. Never exert force as this could cause the
complete internal infl ation system of the valve to come loose. See "Spa Tub Air Valve Fastening" for
valve maintenance.
2
Infl ate the Spa Cover Air Bladder
Open the infl ation valve and insert one end of the infl ation hose (7) into the valve, the other end to the
1.
electric air pump; turn on the pump to infl ate until the air bladder is fi rm to the touch but not hard (see
drawing 7).
Disconnect the infl ation hose (7) from the valve and the infl ation air pump.
2.
Close and recess the infl ation valve.
3.
NOTE: If there is a need to add some air to the spa tub wall or spa cover air bladder after they have been
setup, refer to above "Infl ate the Spa Tub Wall" and "Infl ate the Spa Cover Air Bladder" sections. The cover
air bladder is preinstalled inside the spa cover. If it needs to be reinstalled, place the uninfl ated air bladder
inside the spa cover lip before infl ating the bladder.
For outdoor infl ation:
For outdoor set up, it's recommended to use the manual air pump only to infl ate the spa tub and cover air
bladder.
S AVE THESE INSTRUCTIONS
(275IO) SPA (JET + HARD WATER) ENGLISH 7.5" X 10.3" PANTONE 295U 07/15/2016
SET UP (continued)
3.1
4
1
2
7
6
1
5
7
7
275
English
A
3.2
7
5
7
Page 10