Top View; Bottom View - ERATOS SELF-SERVICE Manual De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
3.4 Installation of sneeze guard
Cooled self-service
1. Dismount the right control panel (A) loosening the two
screws that support the panel and pull downwards.
2. Dismount the front spoiler (B) loosening the screws that
support them on the lower part and pull downwards.
3. Carry out the electrical connection passing the lamp strip
cables through the hole (C) punched on the countertop for
this purpose and connect them to the entrance of the switch.
4. Screw the sneeze guard according to the following
images.
Self-service island
1. Disassemble one of the front faces removing the rivets of
the lower part and pull downwards.
2. Carry out the electrical installation passing the cables
through the hole (C) punched on the countertop for this
purpose and connect them to the entrance of the switch.
3. Screw the sneeze guard according to the following
images.

TOP VIEW

BOTTOM VIEW

12

Publicidad

Tabla de contenido
loading

Productos relacionados para ERATOS SELF-SERVICE

Tabla de contenido