Installation - Home Decorators Collection D10024-12W Guía De Uso Y Cuidado

Tocador con cubierta de porcelana vítrea
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

1
Tracing the outline of the vanity
Determine the ideal location for your new bath furniture.
□ Trace its outline on the wall.
□ Use a stud finder to locate the studs to which you will
attach the vanity.
□ With a level, draw lines along the studs from the floor to
the top of the vanity. These lines will help you spot where
to place the screws in Step 3.
2
Installing Support for Vanity
Provide 2x6 backing material behind the finished wall to properly
support the vanity.
□ To properly secure the vanity, the middle of the required
2x6 backing material must be 32" (815mm) from the
finished floor.
□ Extend the backing material beyond the width of the vanity
to the nearest stud. This will ensure proper support for the
vanity.
□ Front-notch the studs to ensure the 2x6 backing material is
flush against the studs.
□ Secure the 2x6 backing material to the studs with framing
nails.
□ Rough-in the water supply and drain lines into the rough-in
plumbing areas of the vanity.
NOTICE: To avoid the risk of product damage, the finished wall must
be straight and plumb. If the finished wall is not straight and plumb,
the vanity will not be properly supported and will cause misalignment
of the sink and door.
5

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1000 052 989

Tabla de contenido