Operation - Glacier bay 67732W-6001 Guía De Instalación Y Cuidado

Ocultar thumbs Ver también para 67732W-6001:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Checking the operation of the
pop-up
Operate the lift rod (Q) up and down to verify
that the stopper (H) opens and closes correctly.

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) to ush the water lines. Do not
lose the gasket (1) in the aerator.
Ensure the faucet (A) handle is in the off
position, and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Remove the aerator and housing (if applicable).
Turn on the hot and cold water handle to allow
the water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
Q
H
10
Making the water supply
connections
NOTE: The hot side inlet tube is indicated by a label. Avoid
twisting wires together or placing the wires close to each
other and damaging.
Thread the nut (1) on the supply line onto the
outlet of the water supply valve (2) and tighten
with a wrench. Do not overtighten.
1
2
1
8
A

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido