Operation; Changing The Drum; Fault Identification And Troubleshooting; Personal Protective Equipment - IBS Scherer F Traducción Del Manual Original

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Secure the return pipe (8) to one end of the drain on the tub (9) and with the other end of the 3/4" return connection.
Insert the brush pipe (5) through the round rear wall opening (11) of the tub and plug in the cleaning brush (6).
Establish an electrical connection as follows:
Connect the plug connection (7) to the right square tube spars with the pump motor. Secure the plug connection with the turnover
bracket (not necessary in the case of compressed air operation).
Plug the mains plug (10) into the 230 V socket.
Perform a function test.

6.2.2. Operation

Place the workpiece to be cleaned on the support rack.
Press the foot switch to turn the device on.
Clean the workpiece with the brush.
Release the foot switch to turn the pump off.

6.2.3. Changing the drum

Detach the brush hose from the pump.
Remove the return hose from the drum.
Switch off the power supply to the pump.
Pull the collecting tray (optional) out from under the IBS-Parts Cleaning Device.
Remove the pump from the drum. Seal the drum with a 2" sealing cap for the drum body.
Replace the drum and push the collecting tray back under the IBS-Parts Cleaning Device.
Assembling the IBS-Special Pump (refer to section 6.2.1.).
NOTE
Please complete the warranty card (form) which you will find at www.ibs-scherer.com.
6.3. Fault identification and troubleshooting
Fault
Pump not working
Pump not working
If the steps described above do not resolve the problem please call 0049-67 01-93 83 -0 or contact us per e-mail at info@ibs-scherer.com.
6.4. Personal protective equipment
When handling cleaning agents, protective clothing must be worn in accordance with the safety data sheet for the industrial cleaner used.
Solvent-resistant gloves, safety glasses and aprons must be used with all IBS-Special Cleaning Agents.
Glove material:
Gloves made from polychloroprene (CR), recommended material thickness: > 0.5 mm, max. breakthrough time: 4 hours
Gloves made from nitrile rubber / nitrile latex (NBR), recommended material thickness: > 0.35 mm
Gloves made from fluororubber (Viton) (FKM), recommended material thickness: > 0.4 mm
Permeation rate / breakthrough time: > 8 hours (EN 374)
The exact breakthrough time must be ascertained from the protective glove manufacturer and must be observed. Protective gloves should
be replaced when they show the first signs of wear.
Cause
No power
Pump is faulty
Liquid level in drum is too low
Pump is faulty
Solution
Check that mains plug is plugged in
Replace pump
Check liquid level, if necessary ask IBS Scherer to change
the drum
Replace pump
IBS-BA_Typ_F_F2_F2-D-DE_CZ_PL_ES_EN_04.2020
EN
49

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

F2F2-d212000421200182120031

Tabla de contenido