Descargar Imprimir esta página

Thermador CVS2 Manual Del Usuario página 14

Ocultar thumbs Ver también para CVS2:

Publicidad

Idiomas disponibles

Idiomas disponibles

Countertop
Surface
Left Side
Note: Centerlines of
Rectangular Duct Shown
Fig. 9
Cabinet Cutout Dimensions for Blower:
C
6 3/8"
Table 4
Step 3: Prepare Duct Cutouts in
Cabinet
A. Refer to Figure 9. Drop a plumb-line from
Point "P" at the rear center of the
countertop cutout. Mark this point on the
bottom of the cabinet below. Construct
two reference lines through this point:
one should be parallel to the cabinet
front and directly below the rear counter-
top cutout (Line A-A), and the other (Line
B-B) should be at right angles to A-A.
B. Using these reference lines as a base for
the measurements shown in Table 4,
layout the necessary cabinet cutouts
needed to implement the planned
ductwork route. Where a range of
measurements is noted, choose a
measurement that allows best clearance
from wall studs, floor joists, utilities, or
other obstructions.
14
Cabinet Back
Adjustable Within Range
D
14 1/2"
1 7/8"
Point " " (Center of Rear Cut-line)
Plumb line to
intersection A-A
& B-B
Cabinet Bottom Shelf
E
E
F
15 1/2"
Step 3: Prepare Duct Cutouts in
Step 3: Cabinet
C. Temporarily set intake and cooktop in
place and attach integral blower (or duct
transition fitting if a remote blower is
installed). Refer to steps 6 and 7. Verify
that the duct cutouts as marked will
match the hardware installation. Adjust
the duct cutout as necessary to match
hardware installation.
D. Remove temporarily placed hardware
and make cutouts in cabinet to
accommodate ductwork installation.
E. Make all other cabinet modifications
needed to provide proper clearances for
drawers or removable shelving.
Right Side
Receptacle
Location
G
9 3/4"

Publicidad

loading

Este manual también es adecuado para:

Ucv2