Tripp-Lite BP Serie Manual Del Propietário página 5

Bancos de batería externas
Ocultar thumbs Ver también para BP Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Mounting (Rack)
2
Secure the shelves
and cup washers
• For 2U equipment mounting, place 4 screws total at the front and 4 screws total
at the back.
• For 3U equipment mounting, place 6 screws total at the front and 4 screws total
at the back.
Tighten all screws before proceeding.
Warning: Do not attempt to install equipment until you have inserted and
tightened the required screws. The plastic pegs will not support the weight
of your equipment.
2U
2
3U
2
18-09-336 93-36FF.indb 5
B
to the mounting rails permanently using the included screws
C
as shown.
B
C
B
C
5
C
C
12/18/2018 8:26:58 AM

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido