How To Load Staples - Arrow HT50 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HOW TO LOAD STAPLES

TO LOAD
1. Remove pusher rod from machine.
2. Insert strip of staples.
3. Replace pusher rod.
TO CLEAN STAPLE CHANNEL
1. Remove pusher rod A.
2. Remove screw and nut from hole B.
3. Pull down entire inside frame for complete cleaning.
HOW TO DETERMINE STAPLE SHORTAGE FOR REFILL.
1. Press latch to release pusher rod.
2. Lightly push rod forward until it stops. Visible projected
part of rod indicates amount of staples remaining in track.
BACK TO
INDEX
3

Publicidad

Tabla de contenido
loading

Tabla de contenido